My house was built in 2001.
Aluminum window flashing details.
Vycor plus high performance self adhered flashing provides premium vycor plus high performance self adhered flashing provides premium protection against water infiltration in critical details such as windows and doors.
As a result the aluminum windows are recessed.
These instructions are general in nature.
To shed water over protruding building elements such as window door trim flashing or all three.
The length of the flange should be a dimension see table 3 1 in chapter 3.
Ready made pan flashing product photos by krysta s.
If you have vinyl or metal flanged windows for instance you can install drip cap flashing 4 the home depot over the window itself or over the top trim piece that you install.
This will keep weather out prevent lifting in high winds and provide a neat fin ished appearance.
Flashing at exterior window and door openings shall extend to the surface of the exterior wall finish or to the water resistive barrier for subsequent drainage.
For a wood window unit drip cap flashing can be installed over the trim piece often called brick molding that comes.
Fastenings must be properly sealed.
For us making sill pans on site is efficient and cost effective.
Exterior window and door openings.
Window details 30 residential building details 31.
8 3 2 windows figure 8 7 illustrates the desirable characteristics of a good metal window with nailing flanges.
Download free high quality cad drawings blocks and details of aluminum windows organized by masterformat.
Aluminum clad window patio door installation instructions.
The living room has a 2 8 wall.
At the gable edge use a gable or sidewall flashing.
I ve now exposed the protecto wrap flashing underneath and plan on re flashing a sill pan.
The 2010 california building code section 1405 4 states.
The type and location of the flashings will vary depending on the type of windows and doors.
The manufacturer will accept no responsibility for air or water leakage above under or around the window unit.
For detailed installation instructions by product contact ply gem windows at 1 888 9plygem.
The trim and roofing sheet should be fastened every.
Metal roofing panels are slippery when wet dusty frosty or oily.
Flashing shall be installed in such a manner so as to prevent moisture from.
When properly installed vycor plus flashing tape reduces the risk of mold and rot development and contributes to energy efficiency.
Flashings are needed wherever a drainage plane is terminated as at a roof edge or bottom of wall or interrupted as at openings intersection of assemblies control joints or penetrations of the drainage plane.